Workorder Item/ Workorder “Schedule By” Date

SCHEDULE BY DATE

The “Schedule By” date is the date you want the parts in the workorder to be nested and scheduled on to a plate for cutting.

ScheduleByDisplay

The schedule by date is calculated in one of two ways:

  1. Backward from each workorder item cut by date by a specified number of working days.
  2. Forward from the workorder created date by a specified number of working days. (Workorder is “created” at the point the workorder is first saved)

ScheduleByCalc

Each workorder item will have a schedule by date according to these rules. If we choose method one items with different cut by dates will have different schedule by dates.

The overall workorder schedule by date will be the earliest item schedule by date.

How Do Kinetic Machines

Reduce Cost + Increase Productivity?

Smart Machine Design

Our machines are built for 24/7/365 operation, in order to minimize downtime and keep your business running smoothly three shifts a day.

Learn More

All-In-One Cutting, Drilling & More

See how our K5000xmc plasma cutting system delivers less fixturing, less moving WIP from station to station, and dramatically increased output.

See Video

Best-In-Class Accuracy

We lead the industry in cutting accuracy, milling accuracy and repeatability. Find out how this can help your business save time and maximize production.

Learn More

How Can We Help You?